![Alberto Passoni](https://cdn.zonebourse.com/static/resize/768/576//static/images/insiders/unknown.png)
Profil
Alberto Passoni has worked as a Director at Azienda Elettrica Ticinese since 2015.
Postes actifs de Alberto Passoni
Sociétés | Poste | Début |
---|---|---|
Azienda Elettrica Ticinese
![]() Azienda Elettrica Ticinese Electric UtilitiesUtilities Azienda Elettrica Ticinese engages in the production and distribution of electricity. It focuses on power generation, thermal energy, network, and energy trading. Its projects include Gotthard wind farm, Ritom hydropower plant, and Val D’Ambra II hydropower plant. The company was founded in 1958 and is headquartered in Monte Carasso, Switzerland. | Directeur/Membre du Conseil | 01/10/2015 |
Expériences
Fonctions occupées
Relations
Relations au 1er degré
Entreprises liées au 1er degré
Homme
Femme
Administrateurs
Exécutifs
Sociétés liées
Entreprise privées | 1 |
---|---|
Azienda Elettrica Ticinese
![]() Azienda Elettrica Ticinese Electric UtilitiesUtilities Azienda Elettrica Ticinese engages in the production and distribution of electricity. It focuses on power generation, thermal energy, network, and energy trading. Its projects include Gotthard wind farm, Ritom hydropower plant, and Val D’Ambra II hydropower plant. The company was founded in 1958 and is headquartered in Monte Carasso, Switzerland. | Utilities |